
ThinkLink BACnet/IP and Modbus TCP Integration Guide
Configure ThinkLink TKE/TKG for BACnet/IP and Modbus TCP: field mapping, point lists, network setup, YABE checks and device write verification.
FIELD NOTES / Resources
From interfaces and specifications to integration and applications.
Selection and implementation information, in one place.
Browse all articles ↗
Technical notes, selection guides and product updates.

Configure ThinkLink TKE/TKG for BACnet/IP and Modbus TCP: field mapping, point lists, network setup, YABE checks and device write verification.

Plan a ThinkLink Edge deployment with hardware sizing, network ports, online and offline installation, cloud migration, backups and acceptance checks.

Configure ThinkLink trigger models, alarm severity and notification groups, with LoRaWAN latency considerations, noise reduction and deployment checks.

Compare Semtech UDP, MQTT Bridge and Basic Station for LoRaWAN backhaul, including security, downlinks, NAT traversal, deployment and migration.

Compare ESP32-S3 and STM32 for IoT gateway designs across compute, memory, connectivity, development tools and cost, with a GD6 design example.

Choose Ethernet, Wi-Fi or 4G backhaul for a GD6 gateway based on site connectivity, reliability, latency, cost and failover requirements.
If you already have cloud or server infrastructure, start with GD6. For a platform running locally on the gateway, consider GD7 with ThinkLink built in. Then check the model against the environment, power, backhaul and regional band.
Read the gateway selection guide ↗
Gateway connectivity · Platform deployment · Site conditionsLet interfaces and specifications guide your selection.
Selection guidesIf you already have cloud or server infrastructure, start with GD6. For a platform running locally on the gateway, consider GD7 with ThinkLink built in. Then check the model against the environment, power, backhaul and regional band.
Read article ↗
Selection guidesFor new monitoring points, choose by temperature, humidity, leaks or air quality. For existing instruments, start with dry-contact, current or voltage outputs. Confirm the signal type first, then channels, power and configuration.
Read article ↗From existing protocols to a verifiable data path.
Technical articlesConfirm electrical interfaces and protocols, choose the right collector, then implement reading and processing with EdgeBus / JS. Matching interfaces do not mean matching protocols; existing adapters still need verification for the specific device configuration.
Read article ↗
Technical articlesUse a DIN-rail collector and EdgeBus to read, parse and wirelessly report data from RS-485 instruments already in your control cabinet. Adapted from the KC25x product article on ManThink’s previous website.
Read article ↗See how products work together in application scenarios.
ApplicationsEquipment rooms, warehouses and electrical rooms need both environmental data and timely leak detection. This article draws on ManThink’s previous website to explain KS52 configurations and platform integration.
Read article ↗
ApplicationsM-Bus heat meters connect through KC22 collectors, LoRaWAN gateways and ThinkLink for remote meter reading. Adapted from the previous smart-heating article, with a focus on device roles and checks before retrofitting.
Read article ↗MANTHINK NEWS / Company news
Company updates are being prepared.
For product selection and project collaboration, contact ManThink.