Start with conditions and leaks
Place temperature, humidity, leak and air-quality sensors in offices and equipment rooms as required.
Choose spot or rope probes for KS52; select KS61 by measurements and power configuration.BUILDING / FROM ONE POINT TO THE WHOLE BUILDING
Add environmental monitoring points and connect existing utility meters and equipment. Use ManThink sensors, collectors and gateways to bring field data into ThinkLink.

FIELD → PRODUCT / CHOOSE FOR YOUR SITE
Place temperature, humidity, leak and air-quality sensors in offices and equipment rooms as required.
Choose spot or rope probes for KS52; select KS61 by measurements and power configuration.Keep working water meters, electricity meters and instruments; acquire and parse their outputs with EdgeBus.
Use the matching RS-485 or M-Bus collector and confirm protocols and programs before integration.Select from actual signals: door states, run feedback, or existing analog pressure and level outputs.
KS32 accepts dry contacts. KS31’s 4–20 mA and 0–10 V versions are separate configurations and must not be mixed.RECONNECT / KEEP EXISTING EQUIPMENT WORKING
Confirm interfaces, power and device protocols before choosing collectors and adapters.
EdgeBus integration documentation is available for these third-party devices.
CONNECT → THINK / CHOOSE YOUR DEPLOYMENT
GD6 has no built-in platform. Connect it to cloud or freely self-hosted ThinkLink.
Quad-core processor · 1 GB RAM · 16 GB eMMC. The platform runs on the gateway.
Match the gateway to indoor/outdoor conditions, power, backhaul and regional bands; assess coverage and capacity on site.
THINKLINK / FROM DATA TO APPLICATIONS
START WITH YOUR SITE / START WITH YOUR SITE
Prepare these details for a selection discussion: