# Smart building solutions — ManThink

> Add environmental monitoring points and connect existing utility meters and equipment. Use ManThink sensors, collectors and gateways to bring field data into ThinkLink.

Canonical: https://www.manthink.cn/en/solutions/bms/

BUILDING / FROM ONE POINT TO THE WHOLE BUILDING

Add environmental monitoring points and connect existing utility meters and equipment. Use ManThink sensors, collectors and gateways to bring field data into ThinkLink.

Environment & leaks  Water & electricity metering  Device status

[See how the products work together ↓](https://www.manthink.cn/en/solutions/bms/#product-combination)

![Illustrative glass-fronted office building](https://www.manthink.cn/assets/scene-building.jpg)
Illustrative application scenario · Not a customer project

FIELD → PRODUCT / CHOOSE FOR YOUR SITE

## The right products for your challenges.

01 

### Start with conditions and leaks

Place temperature, humidity, leak and air-quality sensors in offices and equipment rooms as required.

Choose spot or rope probes for KS52; select KS61 by measurements and power configuration.

[![KS52 Temperature, humidity & leak sensor](https://www.manthink.cn/assets/ks52.png)
**KS52** Temperature, humidity & leak sensor](https://www.manthink.cn/en/products/sensors/ks52/) [![KS61 86-box indoor environment monitor](https://www.manthink.cn/assets/ks61.png)
**KS61** 86-box indoor environment monitor](https://www.manthink.cn/en/products/sensors/ks61/)

02 

### Keep your existing meters

Keep working water meters, electricity meters and instruments; acquire and parse their outputs with EdgeBus.

Use the matching RS-485 or M-Bus collector and confirm protocols and programs before integration.

[![KC25 DIN-rail RS-485 collector](https://www.manthink.cn/assets/kc25.jpg)
**KC25** DIN-rail RS-485 collector](https://www.manthink.cn/en/products/collectors/kc25/) [![KC22 IP65 M-Bus collector](https://www.manthink.cn/assets/kc22.png)
**KC22** IP65 M-Bus collector](https://www.manthink.cn/en/products/collectors/kc22/)

03 

### Bring equipment status online

Select from actual signals: door states, run feedback, or existing analog pressure and level outputs.

KS32 accepts dry contacts. KS31’s 4–20 mA and 0–10 V versions are separate configurations and must not be mixed.

[![KS32 Six-channel dry-contact collector](https://www.manthink.cn/assets/ks32.png)
**KS32** Six-channel dry-contact collector](https://www.manthink.cn/en/products/sensors/ks32/) [![KS31 Four-channel analog collector](https://www.manthink.cn/assets/ks31.png)
**KS31** Four-channel analog collector](https://www.manthink.cn/en/products/sensors/ks31/)

RECONNECT / KEEP EXISTING EQUIPMENT WORKING

## Start with the actual interface. Build on existing integrations.

Confirm interfaces, power and device protocols before choosing collectors and adapters.
EdgeBus integration documentation is available for these third-party devices.

[Explore integration options ↗](https://www.manthink.cn/en/edgebus/#integrated-devices)

![Water meter reference image](https://www.manthink.cn/assets/integrated-21121.webp)

Integrated third-party device

### ZENNER DN25 / DN40

Water meter · Modbus RTU

[Integrated third-party deviceZENNER DN25 / DN40Water meter · Modbus RTU ↗](https://www.think-link.net/docs/zh/Integration/Device/meter/KC21-21121-ZENNER.html) ![Reference image of a single-phase tariff-controlled smart meter](https://www.manthink.cn/assets/integrated-23114.webp)

Integrated third-party device

### DDZY2397

Single-phase smart meter with tariff control · DL/T 645

[Integrated third-party deviceDDZY2397Single-phase smart meter with tariff control · DL/T 645 ↗](https://www.think-link.net/docs/zh/Integration/Device/meter/23114-DDZY2397.html)

CONNECT → THINK / CHOOSE YOUR DEPLOYMENT

## Connected through a gateway. Where will the platform run?

GD6 / ESP32 

### Connect to external ThinkLink

GD6 has no built-in platform. Connect it to cloud or freely self-hosted ThinkLink.

Field devices → GD6 gateway → External platform

[Choose a GD6 gateway ↗](https://www.manthink.cn/en/products/gateways/?signal=gd6)

GD7 / UBUNTU 

### Full ThinkLink inside the gateway

Quad-core processor · 1 GB RAM · 16 GB eMMC. The platform runs on the gateway.

Field devices → GD7 gateway + ThinkLink

[Choose a GD7 gateway ↗](https://www.manthink.cn/en/products/gateways/?signal=gd7)

Match the gateway to indoor/outdoor conditions, power, backhaul and regional bands; assess coverage and capacity on site.

THINKLINK / FROM DATA TO APPLICATIONS

## From individual measurements to building operations.

- Organize devices and data by building, floor and subsystem.
- Bring environmental changes, energy trends and alerts into one view.
- AI assists troubleshooting; control actions require human confirmation.

[Explore the ThinkLink solution](https://www.think-link.net/zh/solutions/bms/) 

[ThinkLink App · Data & alerts](https://www.think-link.net/zh/mobile/thinklink/) [TapLink · On-site setup for supported devices](https://www.think-link.net/zh/mobile/taplink/)

[![Anonymized ThinkLink smart-building dashboard demo](https://www.manthink.cn/assets/solution-bms-cockpit.webp)](https://www.think-link.net/zh/solutions/bms/) Official anonymized ThinkLink demo · Results depend on connected devices and configuration

START WITH YOUR SITE / START WITH YOUR SITE

## Bring your site requirements. Let’s select the right products.

[Discuss smart buildings ↗](mailto:info@manthink.cn?subject=Smart+building+solution+inquiry&body=Hello%2C+I+would+like+to+learn+about+your+smart+building+solution.%0A%0ABuildings%2C+floors+and+measurement-point+count%3A%0AExisting+device+models%2C+interfaces+and+protocols%3A%0APower+availability+and+gateway+locations%3A%0ACloud+or+local+platform+requirements%3A)

Prepare these details for a selection discussion:

- Buildings, floors and measurement-point count
- Existing device models, interfaces and protocols
- Power availability and gateway locations
- Cloud or local platform requirements
